ODLUKU
o izmjeni odluka o proglašenju nacionalnih spomenika Bosne i Hercegovine donesenih zaključno sa 50. sjednicom Komisije za očuvanje nacionalnih spomenika


Privremena lista nacionalnih spomenika

Privremena lista nacionalnih spomenika Bosne i Hercegovine
KOMPLETNA


O privremenoj listi

Odluka o brisanju spomenika sa Privremene liste

Lista peticija za proglašenje dobara nacionalnim spomenicima

Odluke o odbijanju prijedloga za proglašenje nacionalnim spomenikom

Ugroženi spomenici

Odluke donesene na posljednjoj sjednici

Online peticije

Pokretno

Nepokretno

MANAGEMENT PLAN
Nomination of the Properties for Inscription on the World Heritage List
Mehmed pasha Sokolovic Bridge in Višegrad
Bosnia and Herzegovina


MP - PART 6B

Issue 2.3: Monitoring of environmental impacts

No.

Monitoring

Source

Time

Costs EUR

1.

water level in front of the Bridge

RSG

U

 

2.

water quality in front of the Bridge

2.1 legally prescribed parameters COD (signs given in English);

2.2 legally prescribed parameters BOD 5, pH and others (signs given in English);

RSG

U

 

3.

air

-levels of black smoke, SO2, Nox, O3

RSG

U

 

4.

Bio monitoring

4.1 flora growing on bridge

4.2 wild plants in the I Protection Zone

RSG

U

 

5.

waste

waste deposit on the Bridge and in the I Protection Zone

RSG

U

 

 

 

 

 

5.000

 

 

Issue 3: Planning and policy

Objective 3.1.

Improvement of legal regulation pertaining to the field of architectural heritage

No.

Projects

Sources

Timescale

Costs EUR

4.

Harmonisation of spatial planning legal regulations with the principles of

protection of cultural properties

RSG

COMBIH

M-L

 

6.

Institutional capacity building for the

protection of cultural properties

RSG

COMBIH

M-L

 

9.

Developing a protection methodology in the integral planning process

RZRS

IUPRS

M

 

 

Objective 3.2.

Fostering protection and integration of the bridge into planning documentation

No.

Project

Sources

Timescale

Costs EUR

1.

Devising a development strategy for the Višegrad Municipality

VM

S

15.000

2.

Adoption of the RS Regional Plan to

2015

RSG

S

 

3.

Adoption of the Reviewed Spatial Plan of Višegrad

VM

S

 

4.

Completion of the Višegrad Urban Plan

VM

S

 

5.

Programme of design for the First

Protection Zone

VM

S

 5.000

6.

Valorisation of cultural and historical

heritage in the urban area

VM

M

 5.000

7.

Preparation and devising of a regulation plan R1 for the First Protection Zone

VM

S

 5.000

8.

Preparation and devising of regulation planS for buffer zone

VM

S

 5.000

12.

Devising an urban plan for the First

Protection Zone

VM

M

15.000

13.

Devising detailed urban and technical

conditions for the banks of the Drine in the zone surrounding the Bridge

VM

RSG

M

15.000

 

Objective 3.3.

Improvement of the physical structures in the Bridge surrounding

No.

Project

Source

Timescale

Costs EUR

1.

Project of reparation of the hotel

Hotel owner

S

30.000

2.

Project of reparation for the Bridge

Museum (ob.2)

VM

S

15.000

3.

Project of reparation of Ivo Andric's

home

 

VM

Building owner

S

10.000

 

 

 

 

55.000

 

Objective 3.4.

Managing activities in the area

No.

Project

Source

Timescale

Costs EUR

1.

Issuing construction permits in

accordance with defined urban and

technical condit ions

MRPRS

VM

U

 

2.

Monitoring of adherence of construction works to issued permits

VM

U

 

3.

Control of construction in terms of

protection and design of the area

MRPRS

VM

U

 

 

 

Issue 4: Traffic and parking management

Objective 4.1.

Improvement of the traffic network

Devising planning documentation for the reconstruction of the traffic network

No.

Project

Source

Timescale

Costs EUR

1.

Devising urban and technical conditions for the reconstruction of roads in the Bridge zone

RSG

S

15.000

2.

Devising Urban and technical conditions for the reconstruction of the railway station

VM

M

20.000

3.

Devising a regulation plan for the town beltway

VM

M

20.000

4.

Devising urban and technical conditions for the construction of the town beltway

VM

L

20.000

 

 

 

 

75.000

 

Devising technical documentation for the reconstruction of the traffic network

No.

Project

Sources

Timescale

Costs EUR

1.

Devising project of reconstruction for

roads in the Bridge zone

RSG

S

 25.000

2.

Devising a project of road signalization in the Bridge zone

RSG

S

 10.000

3.

Devising a concept design for the town beltway route

VM

M

 50.000

4.

Devising a construction project for the town beltway

VM

L

100.000

 

 

Issue 5. Access and visitor management

Objective 5.1

Creating tourist activities, improve capacities, presentation and interpretation

 

Project

Source

Timescale

Costs EUR

1.

Plan of revitalisation of existing

accommodation capacities

Produce assessment studies for the

revitalisation of existing capacities / hotel Vilina Vlas, health spa…

VM

S

 

2.

Tourist Agency Complete the registration and formation process

VM

S

 

3.

Creation of web page

Create a web page to present capacities of the Municipality and information on the Bridge Tourist Agency should engage a web master

from among its staff or outsource

(6. months after start of TA activities)

VM

S

 

4.

Preparing information for brochures and leaflets Assemble information on the Bridge and Višegrad, tourism potentials and contents, the art colony…, select and edit texts

VM

S

 

5.

Tourist guides

Motivate and select potential tourist guides

VM

S

 

6.

Tourist package deals

Create package deals for guests interested in diverse activities such as hunting, fishing and the like

VM

S

 

7.

Plan of compensation for individual owners

Establish possible claims of individual owners of buildings and land in the First and Buffer Zones around the Bridge

VM

S

 

8.

Presentation and promotion plan

Make a plan for the promotion and

presentation of the Bridge and capacities of Višegrad to various target groups

VM

S

 

9.

Plan of monitoring the number and structure of guests

Devise the plan and foresee activities and responsibilities for monitoring the number of visitors to the Bridge and to Višegrad

VM

S

 

10.

PR action

Action directed at motivating the residents,

In the first few months and repeatedly following after

VM

S

 

11.

Maps

Production of maps of the destination and wider area towards the Dobrun monastery and health spa

Following the preparation of the

promotional plan

VM

S

 

12.

CD

Produce a CD with photographs and

drawings of the bridge as presentation materials

VM

S

 

 

Promotional material

VM

S

12.000

 

Promotional material

VM

M

20.000

13.

Museums

-Establish the Bridge Museum in facility marked as 2 (see issue 3) and assemble all materials related to the Bridge

-Establish a museum in the home of Ivo Andric and assemble all materials related to his life and work

VM

M

35.000

14.

Basic design of signs at the location

Define the basic design and possibly adopt a logo for the destination

Place immediately after the adoption of the Plan

Foresee an award for the approved design

CPNM

VM

S

 7.500

15.

Forming an Information Centre

Form an Information Centre within the Tourist Agency

VM

S

10.000

 

 

 

 

84.500

 

 

Issue 6. Research

Objective 6.1

To promote and encourage appropriate research to improve understanding of historical value and

condition of the Bridge, and to assisst the implementation of the Management Plan

 

Projects

Source

Time

Costs EUR

1.

Undertake further work on character

assessment of the Bridge

VM

U

 

2.

Undertake reserch works on material and stability condition of the Bridge (see- issue 1)

 

S

 

3.

Update the survey of the Bridge, archiving of existing and new data

CPNM

RSG

M

 

4.

Monitoring of environmental impacts (see issue 2) – planned programme, reactive work and management plan work

 

M

 

5.

Undertake evaluations – site management, low-impact work methods, value-adding processes

CPNM

M

 

 

 

 

 

10.000

 

 

Issue 7. Education

Objective 7.1

Introducing all interested subjects to the significance of the Bridge, the Management Plan for the

Bridge, the possibilities of sustainable development of the Višegrad Municipality where the Bridge is to play a crucial role in the development of tourism, and to the possibilities of active participation in implementing the Management Plan.

No.

Projects

Source

Time

Costs EUR

1.

Devise a plan of education about the

significance of the Bridge as a national monument

VM

RSG

M

2.000

2.

Carry out education in schools and

community centres

RSG

M

 

4.

Organise training of non-governmental sector for the protection of the Bridge

VM

Per year

3.000

5.

Carry out ecological education of tourist guides

VM

Per year

3.000

6.

Undertake training for BC coordinator

VM

Per year

5.000

 

 

Issue 8. Information management

Objective 8.1

To ensure that the gathering, recording, analysis and management of information about the Bridge is undertaken in a way which assisst the implementation of the Management Plan and encourage data sharing and development of compatible databases.

 

Projects

Source

Time

Costs EUR

1.

Update the collection of documents about the Bridge

CPNM

U

 

2.

Establish a collection of documents about the Bridge

VM

S

3.000

3.

Devise a rulebook on archiving, management and storage of documentation

VM

S

1.000

4.

Ensure conditions for the storage and

management of the collection

VM

S

2.000

 

 

Issue 9: Management structure

Objective 9.1

To ensure that the management arrangements for the Bridge are effective and appropriate for the

implementation and monitoring of the Management Plan

 

Projects

Source

Time

Costs EUR

1.

Elaborate terms of reference for Bridge Commission

VM

S

 1.000

2.

Establish Bridge Coordination and Support Team (salary for Coordinator, office equipment, honorariums for temporary engagements)

VM

Per year

20.000

3.

Identify appropriate indicators to monitor progress in implementing the Management Plan

VM

M

 

 

Objective 9.2

To encourage active community involvement in the management

 

Projects

Source

Time

Costs EUR

1.

Bridge newsletter

VM

S

2.000

2.

Establish system through which local

residents and groups can influence

management

VM

S

1.000

3.

Mobilize volonteers and non-governmental organizations

VM

S

2.000

 

 

 

 

5.000

 

 

Issue 10: Sources and Levels of Finance

Objective 10.1

To create a stabile and sufficient sources of financing

 

Projects

Source

Time

Costs EUR

1.

to elaborate the scheme of local taxes and rents

VM

S

1.500

2.

to elaborate the scheme of the

contributions from other revenues from tourism

VM

S

1.500

 

Objective 10.2

To develop arrangements for identifying and accessing external funds

 

Projects

Organisations

Time

Costs EUR

1.

Investigation and identification of

external funding opportunities

CPNM

S

 2.000

2.

to undertake marketing activities and

campaign in order to obtain donations and grants

CPNM

S

10.000

3.

to undertake necessary steps to provide a credit under favorable terms with international financing institutions

CoMBIH

CPNM

M

 

 

 

6.2 Monitoring and Reviewing the Management Plan

Management planning does not stop with the production of the Management Plan document. Regular monitoring is essential to address the management. An appropriate monitoring regime will need to be developed using relevant and measurable indicators which will assist the process of monitoring achievement of the Management Plan. The Bridge Commission should agree each year an Annual Action Program which will identify those elements of the Action Plan which will be implemented during the forthcoming year. It is recognized that the strategies and actions of the Plan will retain their relevance for five to ten years and the overall objectives for much longer. It is proposed that there should be a formal review of the issues and strategies at least every five years and the Plan revised to reflect possible changed circumstances.

 

6.3 Partnership and commitments

The challenge now facing the Bridge Commission is to translate the Management Plan principles,

objectives and proposals into actions on the ground. The Bridge Commission Coordinator should play a key role in enabling the member institutions and organizations and the wider community to work together to achieve the objectives of the Management Plan.

It is recognized that individual institutions and organizations will each have their own particular contributions to make to the overall management and the Management Plan will provide a framework and

context for these.

The following acts prove the commitments of responsible institutions:

¾      Decision to adopt the Management Plan no. by the Council of Municipality Visegrad;

¾      Conclusion of the adoption of the nomination file and the managent plan by the Presidency of BiH;

¾      Conclusion by the Council of Ministers of BiH;

¾      Conclusion by the Commission to Preserve National Monuments.