ODLUKU
o izmjeni odluka o proglašenju nacionalnih spomenika Bosne i Hercegovine donesenih zaključno sa 50. sjednicom Komisije za očuvanje nacionalnih spomenika


Privremena lista nacionalnih spomenika

Privremena lista nacionalnih spomenika Bosne i Hercegovine
KOMPLETNA


O privremenoj listi

Odluka o brisanju spomenika sa Privremene liste

Lista peticija za proglašenje dobara nacionalnim spomenicima

Odluke o odbijanju prijedloga za proglašenje nacionalnim spomenikom

Ugroženi spomenici

Odluke donesene na posljednjoj sjednici

Online peticije

Pokretno

Nepokretno

MANAGEMENT PLAN
Nomination of the Properties for Inscription on the World Heritage List
Mehmed pasha Sokolovic Bridge in Višegrad
Bosnia and Herzegovina


MP - PART 6A

PART 6

 

6. IMPLEMENTATION OF THE MANAGEMENT PLAN

6.1 Financing Management Plan Implementation

This section identifies sources and levels of funding of the projects outlined in the Programme for

Action.

Implementing the proposed actions contained in the Management Plan will require the significant

levels of funding and resources. The institutions responsible for management commit resources for the implementation of the Plan through their individual budgets. The Management Plan provides the opportunity to introduce greater coordination between responsible institutions budgeting for the Plan implementation.

The tables below provide the projects, time for their execution, source of funding and approximate

costs.

The costs of projects given in the tables below are approximate, based on the expirience from similar projects. The costs of projects will be precisely defined after tendering procedures. The aim of the exposing approximate costs is to help responsible institutions to plan the budgets for implementation of the Plan.

Based on costs essessments the following sources and levels of funding are defined for the projects that will commence within 18 months (marked as S -short period) and thouse that are underway (marked with a U):

¾      Government of Republika Srpska: 139.000 EUR

¾      Visegrad Municipality: 137.500 EUR

¾      Commission to Preserve National Monuments 22.000 EUR

¾      Building owners: 55.000 EUR

The projects with time periods marked as M (medium) to be commenced within 18 months to 5 years, and projects with time period marked as L (long) to be commenced over 5 years are part of Developing budget. Every year the Bridge Commission should plan the budget according to the proposed

actions.

The implementation of the Plan will also require additional funds from external sources. For the actions outlined as medium and long term, the local sources will not be sufficient and a credit from the international financial institutions is to be taken.

The following abrevations for sources of funding are used:

CPNM – Commission to Preserve National Monuments

CoM BiH – Council of Ministers of Bosnia and Herzegovina

RSG – Government of Republika Srpska

VM – Municipality Visegrad

WIRS - Water Inspection of Republika Srpska

DWRS – Directorate for waters of Republika Srpska

EDRS - Electricity Distribution of Republika Srpska

PCCVM - Public Communal Company of Višegrad Municipality

HE – hidroelectric power plant

HMIRS – Hydro-Meteorological Institute of Republika Srpska

 

Issue 1: Conservation Management

Objective 1.1

Safeguarding of the bridge integrity

No.

Projects

Source of

funding

Time

Costs EUR

1.

Monitoring of stability of structural

elements

RSG

continuous

5.000,00 per year

 

Objective 1.2

Establishment of the stability and general condition of the Bridge,

Stage 1. Preparation of the documentation needed for design of the research works project

No.

Projects

Source

Time

Costs EUR

1.1

Collection and detail analysis of the existing documentation

RSG

U

3.000

1.2

Geodesist survey of current condition

including

RSG

U

2.000

1.3

Architectural survey of current condition including

RSG

S

2.000

1.4

Detail record of all damages (using

drawings made through survey)

RSG

S

1.000

1.5

Collecting data on speed of the river under each vault

RSG

S

  500

 

 

 

 

8.500

 

Stage 2. Research works on materials and condition of the construction

No.

Projects

Source

Time

Costs EUR

2.1

Geological geomechanical study of types

of materials used on piers and buttresses:

- test drillings from roadway to

substrate layer (rock);

- process samples,

- report

RSG

S

20.000,00

2.2

Determine condition in area above arch

extrados:

- excavate test shafts at previously

agreed positions

- determine strata and details:

o hydro insulation – study

condition,

o infill – study physical and

chemical characteristics of

the materials,

o inner side of spandrel

walls – study condition,

o upper side of stone arch –

study condition, take and

test samples, ascertain

possible presence of metal

cramps

RSG

S

 7.000,00

2.3

Determine condition of arch intrados:

- determine possibility of erecting

temporary scaffolding in certain

places

- erect scaffolding as previously agreed

- study condition of stone blocks and

joints

RSG

S

15.000,00

2.4

Determine condition of base of piers and

foundations of the structure:

- identify positions and technical

options for constructing cofferdams;

the aim being to study the condition in

at least one pier position yet to be

repaired and in at least one pier

position repaired in 1980/81

- issue tender, collect bids, select

contractor and make final decision on

places where cofferdams are to be

built

- carry out cofferdam works

- determine condition in enclosed areas

with emphasis on:

o detailed survey of damage

o taking samples of

materials and testing to

identify physical, chemical

and biological

characteristics

o determine condition of

previously repaired

foundations

o determine condition of

timber grillage

o investigate existence of

timber piles

- Additional underwater survey of

remaining areas

RSG

S

48.000,00

2.5

Take samples and test materials from the Višegradska banja quarry

RSG

S

 5.000,00

 

 

 

 

95.000,00

 

Stage 3. Processing of the results from research works

No.

Projects

Source

Time

Costs EUR

3.1

Design of the hydrological study

RSG

S

3.000

3.2

Design of the preliminary static analyses

RSG

S

4.500

3.3

Conclusions and recommendations

RSG

S

1.000

 

 

 

 

8.500

 

Objective 1.3

Presentation

No.

Projects

Source

Time

Costs EUR

1.

Bridge lighting project

RSG

M

 5.000

2.

Bridge lighting

RSG/external

M

50.000

 

 

 

 

55.000

 

 

Issue 2: Management of the environmental impacts on the Bridge

Issue: 2.1. Floods and the operation of hydroelectric plants

Objective 2.1.1.

Prevent or Moderate Floods

No.

Projects

Source

Time

Costs EUR

1.

Devise flood prevention plan

 

M

 

2.

Work out an early warning and reporting system

 

M

 

3.

Devise a flood defence plan and system of intervention measures with special attention to protecting the Bridge

 

M

 

4.

Elaborate a plan of coordination between civil protection and the hidroelectric power plants within the flood defence system

 

M

 

 

 

 

 

50.000

 

Objective 2.1.2.

Ensure adequate regime of operation of HE Višegrad

No.

Projects

Source

Time

Costs EUR

1.

harmonize the flood prevention plan with the plans of HE Višegrad

RSG

HE-Visegrad

M

 

2.

harmonize the flood defence plan and system of urgent measures with the plans of HE Višegrad

RSG

HE-Visegrad

M

 

3.

commit HE Višegrad to perform

continuous measurements and report on the amount of water released from the accumulation, especially in terms of maintaining the ecological minimum

RSG

HE-Visegrad

M

 

4.

commit HE Višegrad to devise a plan for receiving large quantities of water and a coordination plan for the release of water from the HE Bajina Bašta storage lake

RSG

HE-Visegrad

M

 

 

 

 

 

2.000

 

Objective 2.1.3.

Ensure that the Public Electricity Distribution Company of Republika Srpska performs its

obligations as per the construction licence

No.

Projects

Source

Time

Costs EUR

1.

Regulate the Drina riverbed downstream from the dam to the Mehmed Pasha Sokolovic Bridge

RSG

HE-Visegrad

M

1.000.000

2.

Repair the Bridge piers in accordance with the requirements of the construction licence. Results from the research works on the state of the Bridge will inform future management. Approximate figures will result from the Design

RSG

HE-Visegrad

M/L

2.500.000

 

 

 

 

3.500.000

 

Objective 2.1.4.

Prevent negative effects of the HE Bajina Bašta accumulation

No.

Projects

Source

Time

Costs EUR

1.

Bilateral agreement that will regulate the reduction of the level of storage water in Bajina Bašta to the planned level

CoM BIH,

Government

of Serbia and

Montenegro

S

 

2.

Devise a plan of repairing the banks of the storage lake when the water levels of Bajina Bašta are reduced to the planned level

CoM BIH,

Government

of Serbia and

Montenegro

M

 

3.

Devise a plan to repair the banks of the Drina downstream from the Bridge after reducing the water level in the storage lake

CoM BIH,

Government

of Serbia and

Montenegro

M

 

 

 

 

 

10.000

 

 

Issue: 2.2. Prevention of potential negative environmental impacts on the Bridge

Objective 2.2.5.

Prevent grass and weeds growing in the cracks and between the stone blocks of the Bridge

No.

Projects

Source

Time

Costs EUR

1.

Devise a plan of clearing grass and weeds from the Bridge

RSG

S

 

2.

Determine the best way to remove grass and weeds with the least possible use of chemical agents (herbicides)

RSG

S

 

 

 

 

 

2.000

 

Objective 2.2.6.

Set up a waste management system

No.

Projects

Source

Time

Costs EUR

1.

Devise a plan of collection and disposal of waste

VM

M

 

2.

Develop a system of selective waste collection

VM

M

 

3.

Technically enable the public communal company

VM

M

 

4.

Increase the number of cleaning staff

VM

M

 

5.

Intensify control by establishing an ecopolice force and by making inspection bodies more efficient

VM

M

 

6.

Acquire and set up litter bins

VM

S

5.000

 

Objective 2.2.7.

Reduce the negative effect of snow and ice on the us age and maintenance of the Bridge

No.

Projects

Source

Time

Costs EUR

1.

Provide winter maintenance services with equipment and material resources for maintenance of the Bridge

VM

S

 

2.

Make the Bridge maintenance a priority

with the public communal company

VM

S

 

3.

Educate staff on the specific nature and importance of regular maintenance of the Bridge and its protection zone

VM

S

 

 

 

 

 

2.000

 

Objective 2.2.8.

Retain the quality of water of the Drina in Višegrad and prevent jeopardizing current quality

No.

Projects

Source

Time

Costs EUR

1.

Connect all water flows into a sewage system

VM

L

 

2.

Direct all sewage lines from the inner

town centre to the common collector

VM

L

 

3.

Prevent direct release of industrial waste waters into the river Drina

VM

L

 

4.

Construct a city waste water treatment plant

VM

L

 

 

 

 

 

2.500.000

 

Objective 2.2.9.

Prevent jeopardizing the air quality at the Bridge micro-location and within the Bridge

Protection Zone

No.

Projects

Source

Time

Costs EUR

1.

Plan the construction of a thermal power plant and connection the buildings to the unique heating system

RSG

VM

L

 

2.

Prevent the construction of industrial

facilities in the vicinity of the Bridge and locations from which pollution could spread to the Bridge

RSG

VM

L

 

 

Objective 2.2.10.

Follow environmental quality standards when rehabilitating old industrial facilities and

building new ones

No.

Projects

Source

Time

Costs EUR

1.

Plan industrial development with "clean production"

RSG

VM

investors

L

 

2.

Apply the best available technologies

(BAT) when planning the revitalisation of existing facilities and the construction of new ones

RSG

VM

investors

L

 

3.

Organise regular monitoring and reporting by operators of facilities and plants

RSG

VM

investors

L

 

4.

Educate interested parties in

environmental protection and legal

regulations for environmental protection

RSG

VM

investors

L

 

 

 

 

 

2.500.000

 

Objective 2. 2.11

Plan special protection measures in case of infrastructure works in the Bridge Protection

Zone

No.

Projects

Source

Time

Costs EUR

1.

Devise a Bridge protection plan when

constructing infrastructure

RSG

VM

investors

L

 

2.

Plan material and technical resources with least risk for the Bridge Protection Zone and the environment

RSG

VM

investors

L

 

3.

Devise a plan to repair damages in the Protection Zone and to restore it to its original state

RSG

VM

investors

L

 

4.

Educate staff on protection measures prior to construction works

RSG

VM

investors

L

 

 

 

 

 

2.000

 

NASTAVAK - FOLLOW- UP

 